What the Township of Uxbridge asks for with an addition, how Cloudpermit works and what changes on a septic or moraine lot.
Yes. In Ontario, every addition needs a building permit, and the Township of Uxbridge issues them through Cloudpermit.
Not sure? Ask the Township before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.
Most additions need these. On septic, the Region of Durham Health Department looks at the system too.
The house and addition on the lot, with setbacks to every property line, lot coverage and the driveway.
Existing and new floor plans with rooms labelled, plus every side of the house as it will look.
Wall and floor build-ups, beams, lintels and any engineered parts like trusses or joists.
Heat loss and duct layout for the new space, sized to the addition.
The energy efficiency design summary the Building Code asks for on additions.
Schedule 1 from a registered designer, unless an architect or engineer stamped the drawings.
Applications go in online through Cloudpermit, introduced by the Township in 2022.
Upload the drawings and forms, pay and track the application online.
Region of Durham Health for septic, and a conservation authority if the lot is regulated.
10 business days for a complete house application. Comments add time.
Posted on site for the whole build.
Booked through Cloudpermit. Nothing gets covered until the inspector passes it.

A lot of Uxbridge is on wells and septic systems, and the township sits on the Oak Ridges Moraine and in the Lake Simcoe watershed.
Yes. The Township of Uxbridge issues building permits for additions through Cloudpermit.
The Township's posted fee for residential additions is $11.65 per square metre of floor area, with a $125 minimum. Check the current rate before you budget.
The Region of Durham Health Department issues septic permits and inspects systems for the Township.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
Only if the lot is in a regulated area. In Uxbridge that can be the Lake Simcoe Region or the Toronto and Region conservation authority.
The Electrical Safety Authority, separate from the Township's building permit.
A site visit shows what your lot allows and what an addition would involve.