Rear additions
A bigger kitchen, family room or main-floor bedroom off the back of the house.
Rear additions, second storeys and rooms over the garage, in town or on a rural lot, with the drawings and the Township permit handled for you.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately. See the full cost guide.

Going up keeps your yard and can double the bedrooms on the same lot. Before anything is drawn, an engineer checks that the foundation and walls can carry the new floor.
Second storeys fall in the same rough budget as other additions, $300 to $500 per sq ft before HST.
Read the second-storey guideYes. Every addition needs a building permit from the Township of Uxbridge, and applications go in through Cloudpermit. Read the full permit guide.
Any addition, a second storey, a room over the garage or a bump-out.
Online through Cloudpermit, where you upload drawings, pay, ask questions and book inspections.
10 business days for a complete house application under the Building Code.
Septic permits and reviews go through the Region of Durham Health Department, not the Township.
Lots in the Lake Simcoe or Toronto and Region conservation authorities' regulated areas need their approval.
The posted fee for residential additions is $11.65 per square metre, with a $125 minimum.
Rear, side and second-storey additions across the Township of Uxbridge, in town and on rural lots.
The main town, on the Oak Ridges Moraine.
Hamlet on Highway 47 in the south of the township.
Hamlet north of Uxbridge.
Hamlet in the north of the township.
Yes. Additions need a building permit from the Township of Uxbridge, applied for online through Cloudpermit.
As a rough budget, $300 to $500 per sq ft before HST. Design and permits are priced separately and quoted after the site visit.
Plan on 2 to 6 months for design and permits, then 5 to 9 months to build, depending on the size, inspections and any changes along the way.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
Often, yes, if the foundation and walls can carry it and the zoning allows the height. An engineer checks the structure before anything is drawn.
Only if the addition doesn't meet the zoning by-law, for example on setbacks, height or lot coverage. That goes to the Committee of Adjustment before the building permit.
Septic permits and reviews go through the Region of Durham Health Department. Adding bedrooms can mean checking the system can take the extra load.
A site visit shows what your lot allows and what an addition would involve.